Risk management is a vital component in the world of project management. Specifically referring to the PMI Risk Management Professional (PMI-RMP) examination, candidates are expected to demonstrate a thorough understanding of how actions can impact the probability or the risk impact in various contexts including but not limited to cost, schedule, and environment.
Impact on Cost
Cost risk refers to the likelihood that the project’s costs may exceed the budget. Various actions can influence the cost risks, such as the decision to use new, untested technologies, or the selection of suppliers. For instance, opting for a cheaper, less reliable supplier may increase the probability of cost overruns due to delays or sub-standard materials requiring replacement.
In another example, a project that adopts variations or additions midway may experience a surge in the cost, which was originally unforeseen. Contingency plans, on-time delivery, and project monitoring could substantially decrease the risk when considering costs.
Impact on Schedule
Schedule-related risks concern the probability that the project will overrun the planned schedule. Factors influencing schedule risks can include inefficient resource allocation, unrealistic task durations, or unanticipated hurdles. A practical example of this is a software development project. If during the project, the team realizes that they need to add a complex feature, it can significantly impact the schedule.
In mitigation, techniques such as Critical Path Method, Gantt chart method, etc., could be applied. By actively monitoring and controlling the schedule and having buffers in place for unforeseen changes or delays, the probability of such risks can reduce.
Impact on Environment
Environmental risks consider the potential for a project to impact the environment negatively. This might be relevant in construction projects, which could lead to habitat disruption, pollution, or waste production. For instance, if a minor oil spill escalates to a major environmental disaster during an oil drilling project, it could lead to massive expense and delays in the project.
Using environment-friendly practices, responsible sourcing, and reducing waste can very effectively minimize the environmental impacts and thereby, the related project risks.
Risk Impact and Probability Matrix
One practical tool for comprehending these concepts is the Risk Impact/Probability Chart. It visually represents the risk’s seriousness by plotting a risk’s impact on one axis and the likelihood or probability of occurrence on the other.
Let’s consider a matrix where:
- The vertical axis (Y) stands for the potential impact of a risk (low, medium, high).
- The horizontal axis (X) signifies the likelihood or probability (low, medium, high) of the risk happening.
High-impact, high-probability risks would plot in the upper-right quadrant and therefore would be the most critical to manage. On the other hand, low-impact, low-probability risks in the lower-left quadrant might be less of a concern.
This article has discussed that actions related to costs, schedules, and environmental considerations, to name a few, can significantly impact the probability and risk impact in a project. Thereby, thorough risk management can greatly enhance the success and value of project execution.
Suffice it to say, for PMI-RMP aspirants, understanding how actions can change the likelihood or impact of a risk is imperative. In the real-world scenario, it enables project managers to better weigh their decisions, craft better strategies, and deliver successful projects while steering clear from potential pitfalls.
Practice Test
True or False: The effect of the activity resources on the cost/schedule/environment may increase the risk impact.
- True
- False
Answer: True
Explanation: The resources allocated to an activity can affect the cost, schedule, and environment, potentially increasing the amount of risk involved.
Select the correct definition of “Contingency Reserve”.
- A. An estimate of the least possible cost of a project
- B. A provision held for future circumstances or potential changes
- C. The maximum time period for completing a project
Answer: B. A provision held for future circumstances or potential changes
Explanation: Contingency Reserve is an amount of time or money that is allocated in anticipation of potential project risks or uncertainties.
Which of the following factors affect the action on the probability or the risk impact?
- A. The duration of the project
- B. The risk management approach
- C. The scope of the project
- D. All of the above
Answer: D. All of the above
Explanation: The duration of the project, the approach to risk management and the scope of the project all have effects on the probability of risk and its potential impact.
The risk response strategy that seeks to reduce the impact or probability of a risk event is known as:
- A. Transference
- B. Avoidance
- C. Mitigation
- D. Exploitation
Answer: C. Mitigation
Explanation: Mitigation is a risk response strategy that seeks to minimize the potential impact or likelihood of a risk event.
True or False: Cost and schedule overruns in a project might lead to an increase in environmental risks.
- True
- False
Answer: True
Explanation: Cost and schedule overruns can lead to hasty decision making and potentially irresponsible practices that might negatively affect the environment.
Who is primarily responsible for the overall risk management in a project?
- A. The Project Sponsor
- B. The Project Manager
- C. The Chief Executive Officer
- D. The Stakeholders
Answer: B. The Project Manager
Explanation: The Project Manager is primarily responsible for the overall risk management in a project, including identifying, assessing, and responding to risks.
Which type of risk can directly affect the project schedule?
- A. Financial risk
- B. Technical risk
- C. Project Management risk
- D. All of the above
Answer: D. All of the above
Explanation: All the listed risks have the capacity to directly affect the project’s schedule.
True or False: Risk impact refers to the potential effect that a risk event has on a project’s objectives.
- True
- False
Answer: True
Explanation: Risk impact truly measures the potential effect or harm a risk event can bring to a project’s objectives such as cost, schedule, quality, or performance.
The process of increasing the probability and impact of positive risks and decreasing those of negative risks is called:
- A. Risk Management
- B. Risk Identification
- C. Risk Analysis
- D. Risk Optimization
Answer: D. Risk Optimization
Explanation: Risk optimization is mainly about enhancing the positive opportunities while reducing the effect of threats or negative risks in the project.
Which of the following SMART criteria refers to the measurability of the risk’s impact?
- A. Specific
- B. Measurable
- C. Achievable
- D. Relevant
Answer: B. Measurable
Explanation: In the SMART criteria, ‘Measurable’ refers that effects of risk on a project objectives need to be quantifiable or measurable.
Interview Questions
How can cost impact the probability of a risk?
Higher costs typically increase the likelihood of a risk occurring. This is because higher costs strain resources, potentially leading to shortcuts or oversights that could increase risk levels.
What is the relation between a project’s schedule and its associated risks?
A tight schedule can increase the probability or the impact of risks because it may force team members to rush tasks, increasing the likelihood of errors. Delays can also add risks related to higher costs, lost market opportunities, and reduced customer satisfaction.
How does the project environment affect the risk impact?
The project environment can greatly influence risk impact. Uncertain, volatile, or complex environments tend to increase both the probability and impact of potential risks.
What is the role of contingency reserves in cost risk management?
Contingency reserves are funds intended to cover identified risks that may impact project costs. They strengthen the project’s resilience to potential cost overruns and reduce its overall risk exposure.
How can effective communication influence the risk impact associated with scheduling?
Effective communication can reduce both the probability and impact of schedule risks by ensuring everyone understands and stays on track with the project timeline, reducing the likelihood of delays or misunderstandings.
How does detailed planning minimize the risk impact on a project’s schedule?
Detailed planning helps identify potential risks early on, allowing for the implementation of mitigation strategies that can minimize delays and avoid unexpected surprises that may disrupt the project schedule.
What is the impact of poor resource allocation on the project risk?
Poor resource allocation can significantly increase project risk. It can lead to overutilization of some resources, underutilization of others, decrease in performance quality, and it could also cause delays, leading to the escalation of costs.
How does a change in government policy impact project risk?
Changes in government policy can introduce unexpected risks to a project. For example, changes in regulatory standards or tax policies could raise costs or cause delays, particularly if these changes were not anticipated in the initial project planning.
What is the significance of risk response strategies in managing cost and schedule risks?
Risk response strategies are crucial in managing cost and schedule risks as they provide pre-planned actions to take when a risk event occurs. These might include avoiding the risk, transferring the risk, mitigating the risk, or accepting the risk.
How does stakeholder management impact risk probability and impact?
Effective stakeholder management can reduce risk probability and impact by ensuring everyone’s expectations are aligned, potential conflicts are managed efficiently, and everyone is committed to the project’s success. Mismanaged stakeholders can lead directly to project risks and increased costs.
Why risk reassessment should be done periodically throughout a project?
Risk reassessment is required periodically because the probability and impact of risks can change over time due to various factors like changes in the project’s environment, scope, time, cost, and quality. Regular reassessment helps to keep the risk register updated and the project team prepared for any form of uncertainty.
What is risk tolerance and how does understanding stakeholder risk tolerance impact a project?
Risk tolerance refers to the level of risk that an individual or organization is willing to accept. Understanding stakeholder risk tolerance allows project managers to set appropriate risk thresholds and mitigation strategies, which helps prevent stakeholder dissatisfaction and potential project failure.
How does quality management influence project risk?
Quality management practices can significantly influence project risk as proper standards and methodologies decrease the chance of errors, significantly reducing risk impacts.
How does project complexity affect the risk impact and probability?
The greater the project complexity, the higher the chances are for risks to occur, and the higher the impacts these risks tend to have. Complex projects have more elements and greater interdependencies, thus increasing both risk probability and potential impacts.
How does risk mitigation address cost, schedule, and environment-related risks in project management?
Risk mitigation aims to reduce the potential impact and probability of risks. For cost, schedule, and environment-related risks, this might involve activities such as additional cost estimating, more thorough scheduling, or ensuring compliance with environmental regulations to avoid fines or legal troubles.