The construction industry is no stranger to complex processes and convoluted contracting methods. However, with an approach combining Lean Integrated Project Delivery (IPD) and Integrated Form of Agreement (IFOA), many of these pain points can be successfully addressed. Herein lies a roadmap to a more streamlined, efficient project execution, with most of it learned from the PMI Construction Professional Exam (PMI-CP).
Lean Integrated Project Delivery (IPD)
IPD is an innovative project delivery method that collaboratively engages all participants, including the owners, architects, construction managers, suppliers, and trade contractors, early in the design process. The goal is to reduce waste, improve efficiency and productivity, and enhance project outcomes in terms of reduced costs and superior quality.
IPD embodies the Lean Construction philosophy, focusing on maximising value for all stakeholders by reducing waste and increasing efficiency and value. It promotes collaborative decision-making, transparent communication, shared risk and reward, and a no-blame culture.
For instance, imagine a large-scale commercial building project. Instead of architects creating designs and then passing them off to construction teams – often leading to misunderstandings and reworking – the IPD process includes everyone from the start. The construction team might even suggest modifications to the design based on their on-the-ground experience, leading to a smoother execution process, less time wasted on misunderstandings, and ultimately a project finished on time and within budget.
Integrated Form of Agreement (IFOA)
IFOA is a contractual agreement integral to the IPD process. The primary principle behind IFOA is ‘shared risk and reward.’ It allows every participating party to share in the project’s profits or losses proportionately. This method helps eliminate adversarial relationships, promote collaboration, and align project goals with those of individual stakeholders.
A traditional contract in a construction project might lead to conflict, with each party protecting their interests even to the detriment of the project as a whole. IFOA, on the other hand, ensures all parties are aiming towards a common goal – successful project completion with quality, value and efficiency.
Lean IPD and IFOA – Resolving Contracting Pain Points
Pain points in contracting often stem from a misalignment of incentives, adversarial relationships, high waste levels, and lack of collaborative problem-solving. However, Lean IPD and IFOA have the potential to address these issues.
- Alignment of Interests: With IFOA, all participating parties have their interests aligned towards the success of the overall project. This reduces conflict and promotes cooperative work towards a common objective.
- Improved collaboration: Lean IPD encourages greater collaboration among all stakeholders. This means all parties – from design to delivery – can make contributions improving the project.
- Reduced Waste: Lean principles aim at reducing waste by eliminating unnecessary activities and streamlining processes.
- Enhanced risk management: Shared risk provides a collaborative problem-solving mechanism for potential risks in the project. Instead of blaming one another, everyone shares responsibility for developing the solution.
- Increased transparency: Lean IPD and IFOA promote transparency, allowing all stakeholders to understand every aspect of the project, reducing surprises, and fostering mutual trust.
The transformational potential of Lean IPD and IFOA lies not only in their inherent merits but also in how they address the inherent challenges in traditional contracting. To harness the full benefits of these approaches, they should be adopted from the outset – ideally during the project’s conceptualisation and strategic planning phase. This leads to more successful project outcomes, less overall waste, and reduced friction between project stakeholders. Lean IPD and IFOA thus provide a reliable roadmap to a more productive and harmonious construction industry.
Practice Test
True or False: Lean Integrated Project Delivery (IPD) focuses on maximizing value and minimizing waste at the project level.
- True
- False
Answer: True
Explanation: Lean IPD is a project delivery approach that emphasizes collaboration and waste reduction in order to maximize overall project value.
In the concept of Lean Integrated Project Delivery, who participate in the project from its design to completion?
- a. Only owners
- b. Only contractors
- c. All key project participants
- d. Only subcontractors
Answer: c. All key project participants
Explanation: Lean IPD promotes collaborative participation from all key stakeholders including owner, architect, contractors, and other major participants.
True or False: Integrated Form of Agreement (IFOA) is a multi-party agreement that focuses only on the profitability of the construction company.
- True
- False
Answer: False
Explanation: IFOA concentrates on project success and shared benefits, not solely on the profitability of one party.
How does Lean IPD help to solve some of the industries contracting pain?
- a. By promoting blame and finger-pointing
- b. By enhancing collaboration and reducing waste
- c. By encouraging individual success over collective success
- d. By increasing the overall cost.
Answer: b. By enhancing collaboration and reducing waste
Explanation: Lean IPD focuses on efficiency, waste reduction, and collaboration among stakeholders, which helps to address the complexities and challenges of contracting in the construction industry.
What is the main goal of utilizing Lean IPD and IFOA in construction?
- a. Increase the project complexity
- b. Achieve best project outcomes
- c. Improve the company’s reputation
- d. Increase the risk of failure
Answer: b. Achieve best project outcomes
Explanation: The main purpose of Lean IPD and IFOA is to reach the best possible project outcome by promoting efficiency, collaboration, and shared risk and reward.
True or False: Lean IPD and IFOA methods promote collaboration, shared risks and rewards, and efficiency all at once.
- True
- False
Answer: True
Explanation: Lean IPD and IFOA methods promote a collaborative approach in which risks and rewards are shared, and efficiency is maximized.
Does Lean IPD aim to minimize waste during the construction process?
- a. Yes
- b. No
Answer: a. Yes
Explanation: An integral part of Lean IPD is focused on minimizing waste and enhancing the value of the project.
What is the main advantage of applying IFOA in the construction industry?
- a. Reduce Collaboration
- b. Increase conflicts
- c. Streamline the project delivery
- d. Increase project costs
Answer: c. Streamline the project delivery
Explanation: IFOA is utilized for formalizing collaboration between different stakeholders, thereby streamlining the project delivery process.
True or False: Lean IPD enhances the risk of project delay.
- True
- False
Answer: False
Explanation: With its collaborative and efficient approach, Lean IPD aims to reduce the chances of delays and overruns.
True or False: One of the significant aspects of IFOA is having a common and shared goal.
- True
- False
Answer: True
Explanation: IFOA promotes having a common and shared goal across all key stakeholders to help achieve the project’s success.
Interview Questions
What is Lean Integrated Project Delivery (IPD)?
Lean IPD is a collaborative approach to project management that allows for the early involvement of important stakeholders, fosters a cooperative team atmosphere, seeks to understand and respect the needs and abilities of all participants, and aims for significant waste reduction, increased productivity, and better relationships.
What does IFOA stand for in the context of Lean IPD?
IFOA stands for Integrated Form of Agreement. It is a type of contract agreement where project parties agree to share in the project profit or loss in a pre-agreed proportion.
How does Lean IPD help resolve some of the industries contracting pain?
Lean IPD streamlines the workflow, reduces rework and waste by allowing for a comprehensive project overview, parallel working, and early and frequent communication between project members. This results in reduced delays and costs, leading to fewer contractual disputes.
How does IFOA help manage risk in Lean IPD?
IFOA incentivizes all parties involved to collaborate effectively, as the project’s profit or loss is shared. If risks cause delays or cost overruns, these are borne by the group, prompting everyone to work together to manage risk.
What is the major difference between traditional contracting and IFOA?
Traditional contracting can lead to disputes and adversarial relationships because each party is looking out for their individual interests, whereas IFOA promotes collaboration and mutual success, as both profit and risk are shared.
How does Lean IPD promote transparency in project management?
Lean IPD emphasizes frequent communication, collaboration, and the use of shared project management tools. This fosters transparency, providing all stakeholders with an understanding of the project status and challenges.
How can Lean IPD improve productivity on a construction project?
Lean IPD can improve productivity through workflow optimization, just-in-time delivery, reduced waste, and the reduction of interruptions and rework—all of which potentially reduce construction timelines.
What role does technology play in Lean IPD?
Technology such as Building Information Modeling (BIM), shared project management software and cloud storage can facilitate the collaboration, communication, and document management at the heart of Lean IPD.
Is Lean IPD suitable for all types of construction projects?
While Lean IPD has many benefits, it may be less suitable for smaller and simpler projects where the level of coordination required may not justify the overheads.
How does using Lean IPD and IFOA affect the contractual relationships among project stakeholders?
Lean IPD and IFOA generally foster more collaborative and less adversarial relations. Everyone has a vested interest in the project’s success, leading to a more cooperative atmosphere and reducing the likelihood of costly legal disputes.
What potential challenges may be faced when implementing Lean IPD and IFOA?
Challenges may include the need for a high level of trust and communication between parties, resistance to changing established work practices, and the need for adequate technology and expertise to manage the collaborative process.
How does Lean IPD and IFOA handle changes or variations in the project?
The shared risk model of IFOA and collaborative approach of Lean IPD allow for early and flexible response to changes, compared to traditional contracting where changes generally result in costs and delays.
How do Lean IPD and IFOA contracts impact project profitability?
Lean IPD and IFOA can potentially improve project profitability by reducing delays, lowering costs through improved efficiency and less rework, and by providing incentives for all parties to work together for the project’s success.
How does Lean IPD encourage continuous improvement in project delivery?
Lean IPD embraces the lean concept of continuous improvement, by promoting open communication, learning from errors, iterative planning and process optimization, and rewarding collaborative problem solving.
Can Lean IPD be combined with other project delivery methods?
Yes, Lean IPD can be combined with other delivery methods such as Design-Build or Construction Manager at Risk (CMAR), providing those methods also involve a collaborative approach suitable for Lean IPD and IFOA principles.